自动化工程师面试英语个人简历范文

小编:嘉怡 594阅读 2020.04.03

First name: ***
Sex: Male  
Year of Birth: ***
Phone: 150 ***
Education: Bachelor 
Major: Mechanical Design, Manufacturing and Automation
work experience:  
Nationality: Han
Graduation School: *** Polytechnic
Address: ***
email:
About me:
Technical management experience in the selection, procurement, installation, commissioning, operation and maintenance of automatic control instruments in the chemical industry. Including: the preparation of the project's preliminary budget, planning, bidding, construction organization design, construction plan, electrical instrumentation equipment commissioning plan, etc., instrumentation and DCS selection. Master project management methods, installation processes and procedures, calculation of project quantities and project progress; effectively allocate personnel, arrange shift team work plans, and organize site construction. During the self-controlling instrument debugging process, it can effectively control the quality of key points such as the monotonic and joint tuning of the electrical MCC system, instrumentation, and DCS system. Familiar with the general chemical process and the performance of instruments and equipment. Familiar with drawings and have the ability to find faults in drawings.
When encountering an emergency, analyze the cause of the accident independently and organize personnel to deal with it on-site. He also has certain capabilities and experience in organizational coordination, emergency response, and safety management. Capable of equipment management, organization of production and site management. Participated in the preparation of ISO9001, 14001 management documents; familiar with national, industrial installation and maintenance standards, norms and regulations.
Familiar with the control process and principle of the control system, and familiar with on-site instrument control. On the basis of skilled application of American Honeywell control system, learn and apply the application of other systems. Proficient in using Word, Excel and CAD software, through the successful completion of several chemical projects and first-line maintenance experience, no matter what kind of work I believe I have the ability and confidence to do well.
Career Objective:  
Target Position: Automatic Control
Target industries: Instrumentation · Industrial Automation · Electric | Chemical
Expected salary: Negotiable
Expected Area: ***
Arrival time: interview
work experience
2009.2-2010.6
*** Beverage Industry Co., Ltd.
Equipment asset management; equipment technical standards, specifications and safety management; equipment team establishment; spare parts management; personnel skills training; leading equipment personnel to perform emergency repairs, determining emergency repair plans; formulating equipment AM, PM, overhaul plan content and monitoring implementation results; implementation 1. Implement technical transformation of equipment; prepare and implement SOP files of GMP and EHS of equipment engineering department; company energy control; monthly economic analysis report of equipment department (equipment failure statistical analysis through ten years of working practice, I fully mastered the principle of electrical relay control, And can design according to the requirements. Mastered the inverter control principle, has the actual experience of inverter configuration of ***, ***, *** and other brands. Mastered the operation principle of PLC control, there are Practical experience in programming with brands of *** and touch screens. Experience in simple program modification of ***, ***, *** and other brand PLCs. Have programming software for the above brands of PLCs. March 2007 I Successfully designed and used the low-temperature filling program for the filling machine of the hot filling line.
I went through the process of installation, commissioning, and acceptance of production line equipment; successfully established a safety stock of spare parts at Ziquan; organized internal and external training of equipment personnel many times to improve the skill level of the equipment team; SOP writing experience; I have extensive experience in preventive maintenance of equipment. In *** company, I used preventive maintenance of equipment by reasonable use of CIP time, making the average efficiency of equipment machinery more than 95%. Company) is among the best; can form a team with a centripetal force; has the experience of energy saving and consumption reduction; through strict implementation of the "Energy Saving Guide Book" I formulated and my energy saving and transformation of equipment, the original unit consumption of my company The 0.143 yuan / L in 2005 decreased to 0.0475 yuan / L in August 2008; experience in GMP management; and experience in EHS implementation. Strong planning and scheduling capabilities, personnel organization and deployment capabilities, and system implementation capabilities. , Power consumption cost analysis, maintenance cost analysis, etc.).
2007.2-2008.6
*** Cement Engineering Company Electrical Assistant Engineer Duties and performance:
Reconstruction of the MCC of the upper second line kiln head (belonging to my previous workshop). I am responsible for this transformation. Contents include instructions for wiring, marking, and commissioning. Because I am more familiar with clinker. Before I arrived at the engineering company, I also made a lot of preparations for the MCC transformation. This technical transformation completed the wiring and RBI four days. It also created a history of winning the project for the first time from Party A. Put into operation within the expected time. No accident has occurred so far. After the MCC transformation is completed, it is put into the installation and commissioning of the slag mill. During the installation and commissioning process, I was mainly responsible for the technical support, wiring, and troubleshooting of the wiring. The electrical part of the slag grinding project was completed around July 25. After the conclusion, I am responsible for the commissioning of the test run with the material. During the installation process, I learned many differences between installation and operation and maintenance. I also understand the close relationship between the various links in the installation process. If the previous preparation is not good. Later, the more dry and tired. The more miscellaneous work. And some mistakes cannot be made up. Serious rework. Although the installation was tiring these months, it made me look at the problem from another angle. Increased insight.
2005.2-2006.6
*** Group *** Co., Ltd. Workshop director Responsibilities and performance: Job responsibilities:
  1. Responsible for various personnel and administrative work in the workshop.
  2. Responsible for the maintenance and maintenance of the entire plant's electrical equipment.
  3. Responsible for various overhauls and renovations of the entire plant's electrical equipment.
Main achievement: 
  Independent design and organization of construction completed the overhaul design and transformation of 26 panels of the 1250 × 2KVA calcined power distribution room; Independent design and organization of construction completed the overhaul design and transformation of 6 panels of the salt transfer room; independent design and organization of construction Raw material, batching, loading and unloading system PLC program automation transformation; Independent design and organization of construction completed three calciner host 185KW motor frequency conversion transformation; Independent design and organization of construction completed more than 20 motors lightning protection transformation, including two 250KW motors And 2 6KV2500KW and 1 6KV1700KW motors for lightning protection transformation; independently designed and organized construction to complete the remote control and transformation of the ground for 2 15-ton bridge cranes; prepared monthly and annual materials plans, maintenance plans, and overhaul plans; The factory has 26 low-voltage power distribution rooms, including various types of motors including 14 high-voltage synchronous machines, 6 high-voltage asynchronous machines, and various inverters ***, ***, ***, ***, ***, ** *, *** from *** total 21 units; maintain the whole plant lightning protection facilities, lighting facilities, various electrical appliances and so on.
Education and training
2001.9-2005.7
*** Bachelor of Science and Engineering:
Mechanical Design, Manufacturing and Automation Professional description and major courses:
Engineering mechanics, mechanical drawing and CAD, numerical control technology, material forming technology, metal cutting principles and tools, mechanical engineering materials, mechanical design foundation, mechanical manufacturing technology, fixture design, control engineering foundation, programmable controller, hydraulic transmission and control , Machinery manufacturing equipment design, etc.
关联标签: